BITUMEN EMULSION PLANT



BITUMEN DRUM MELTER

16 BITUMEN DRUM MELTING UNIT

TECHNICAL SPECIFICATIONS
MAIN FEATURES:
  • 2x8 = 16 drums capacity in drum section.
  • 3.000 - 4.000 kg capacity according to ambient temperature & working conditions.
  • Hydraulic lift able stand to load drums upside-down into melting unit.
  • Hydraulic cylinder to drive the lifting stand-2nos.
  • Hydraulic pumping unit-1no.
  • Bitumen transfer& 6m piping up to bitumen tank-1no.

View Details

30 BITUMEN DRUM MELTING UNIT

TECHNICAL SPECIFICATIONS
MAIN FEATURES:
  • 3x10 = 30 drums capacity in drum section.
  • 6.000 - 9.000 kg capacity according to ambient temperature & working conditions.
  • Hydraulic lift able stand to load drums upside-down into melting unit.
  • Hydraulic cylinder to drive the lifting stand-2nos.
  • Hydraulic pumping unit-1no.
  • Bitumen transfer& 6m piping up to bitumen tank-1no.

View Details


Clientele